Fiber installation, fusion splicing and OTDR certification, carried out by our own teams rather than subcontracted.
Splicing is where fiber links are made or quietly ruined. A poor splice adds loss that may still pass a basic light test but fails under load or degrades over months — and diagnosing it later costs far more than doing it properly.
We fusion-splice with calibrated equipment, then certify every fiber with an OTDR trace and supply the results. If a link has a problem in two years, that baseline is what proves whether it was there from day one.
We keep this in-house deliberately. It's the part of the job where skill differences show up most, and subcontracting the critical step is how quality becomes unpredictable.
Publishing exclusions is deliberate. Nobody in this market does it, and it's the fastest way to avoid a variation conversation later.
If yours isn't here, ask — we'd rather answer it before you buy than after.
Yes, the full traces rather than a pass/fail summary. Without the baseline you have no way to prove a future fault wasn't present at handover.
Yes. We'll locate the fault by OTDR, splice the repair and re-certify the link so you have a clean record from that point.
Free site survey first. You keep the findings whether or not you buy.